A Decision Framework for Managing the Spirit Lake and Toutle River System at Mount St. Helens

★★★★☆ 4.0 36 reviews

US$20.61
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by salemgreenfield.org
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$20.61
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Jul 5
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by salemgreenfield.org
Free 30-day returns Details

Product details

Management number 231454093 Release Date 2026/06/18 List Price US$20.61 Model Number 231454093
Category

The 1980 eruption of Mount St. Helens in southwest Washington State radically changed the physical and socio-economic landscapes of the region. The eruption destroyed the summit of the volcano, sending large amounts of debris into the North Fork Toutle River, and blocking the sole means of drainage from Spirit Lake 4 miles north of Mount St. Helens. As a result of the blockage, rising lake levels could cause failure of the debris blockage, putting the downstream population of approximately 50,000 at risk of catastrophic flooding and mud flows. Further, continued transport of sediment to the river from volcanic debris deposits surrounding the mountain reduces the flood carrying capacity of downstream river channels and leaves the population vulnerable to chronic flooding.The legacy of the 1980 eruption and the prospect of future volcanic, seismic, and flood events mean that risk management in the Spirit Lake Toutle River system will be challenging for decades to come. This report offers a decision framework to support the long-term management of risks related to the Spirit Lake and Toutle River system in light of the different regional economic, cultural, and social priorities, and the respective roles of federal, tribal, state, and local authorities, as well as other entities and groups in the region. It also considers the history and adequacy of characterization, monitoring, and management associated with the Spirit Lake debris blockage and outflow tunnel, other efforts to control transport of water and sediment from the 1980 and later eruptions, and suggests additional information needed to support implementation of the recommended decision framework. Read more

ASIN B07CL5FWT8
XRay Not Enabled
ISBN13 978-0309464482
Language English
File size 17.1 MB
Page Flip Enabled
Publisher National Academies Press
Word Wise Enabled
Print length 328 pages
Accessibility Learn more
Screen Reader Supported
Publication date April 20, 2018
Enhanced typesetting Enabled

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4 out of 5
★★★★☆
36 ratings | 15 reviews
How item rating is calculated
View all reviews
5 stars
75% (27)
4 stars
8% (3)
3 stars
4% (1)
2 stars
2% (1)
1 star
11% (4)
Sort by

There are currently no written reviews for this product.